Construction power plant project Jobs in Indonesia

Construction geothermal power plant project Lumut Balai unit 2 of PT.Pertamina Geothermal Energy (consorcium Mitsubishi Corporation, SEPCOIII Electric Power Construction Co. Ltd, PT Wijaya Karya (Persero) Tbk,) in Muara Enim, South Sumatra is currently need skill position as below

Position :
1.      Planning Schedule Engineer
2.      HSE Supervisor
3.      External Relation Head
4.      Instrument Engineer
5.      Painting Insulation Engineer
6.      Welding/NDT Inspector
7.      Welder 6G Pipe
Job Requirement :
a.      For Indonesians citizens only
b.      Fluent writing and speaking in English (position no. 1,2,3,4,5,6)
c.      Experience in the “Same Position” Min. 5 years in EPC/Power Plant/Oil n Gas/Refinery company
d.      Familiar operate Primavera P6, Ms. Project (no. 1)
e.      Having a POP valid certificate from EBTKE, not from Mining (no. 2)
f.       Have a certificate that is still active in accordance with the requirements of the position (no. 4,5,6,7)
g.      Willing to be placed at Site Project in Lumut Balai, Muara Enim, South Sumatra
h.      Email update CV in “English” with subject (Position_Name) to ivan_ms@sepco3.com

error: Content is protected !!